FINSA Coahuila Industrial Park is located right next to the most important General Motors plant in Mexico, and enables automotive suppliers to operate "Just in Time", "Just in Sequence". Ample roads. High tension electric lines. Fire protection system. Residual water treatment plant.
Highway Saltillo - Piedras Negras Km. 10.8, adjacent to General Motors Saltillo, Coahuila
3 in (7.5 cm) thick asphalt pavements
2 water wells, 12 lps
Connected to water treatment plant, 8 lps
LED Public Lighting
Distribution in medium tension 34.5 Kv
Centralized system with connection to water hydrants at every lot
Distribution loop to reuse domestic water for irrigation and industrial use
Open Channel
Connected to central monitoring system
Digital service
Internal distribution network
Direct acceso to GM plant
PROFEPA, AMPIP
Preparing to download
Write us your doubts
00.00
/
00.00
Av. Alianza Centro 500 Parque de Investigaci¨®n e Innovaci¨®n Tecnol¨®gica (PIIT) Autopista al Aeropuerto km. 10 Apodaca, Nuevo Le¨®n, Mx. 66629